Indore Metro Priority Corridor-2 Inaugurated
Indore Metro Priority Corridor-2 was inaugurated on 5 September 2026 in Indore, Madhya Pradesh. The inauguration covered Phase-I (Reach-II) of the metro project and marked the opening of an 11 km corridor from Super Corridor-3 to Malviya Nagar Chauraha, also known as Radisson Hotel Chowraha.
Indore Metro Network
The operational Indore Metro network expanded with the launch of the new corridor. The active network was reported at about 17 km to 17.5 km after the extension, and the number of operational stations rose to 16.
Project Cost and Route Details
Reach-II was developed at an estimated cost of Rs 2,850 crore. The cumulative project cost of the operational Indore Metro network reached about Rs 4,370 crore after the addition of the new corridor.
Commercial Operations and Service Pattern
Regular passenger services on the extended Gandhi Nagar to Malviya Nagar route began on 6 September 2026. Madhya Pradesh Metro Rail Corporation Limited operated trains from 9:00 AM to 7:00 PM with a 15-minute frequency, and the service completed more than 80 trips daily.
Metro Rail in India
Metro rail systems in India are urban rapid transit systems that operate on standard gauge or broad gauge lines in major cities. The Metro Rail Policy, 2017, provides the framework for planning, financing, and implementation of metro projects in India.
Important Facts for Exams
- Indore Metro is part of the urban rail network in Madhya Pradesh.
- Madhya Pradesh Metro Rail Corporation Limited is the implementing agency for the Indore Metro project.
- Metro systems in India are used for high-capacity urban passenger transport.
- Priority corridors are opened before the full metro network becomes operational.