Chennai inaugurates a modular sewage treatment plant at Kotturpuram
A modular sewage treatment plant with capacity to treat one million litres a day was inaugurated at Kotturpuram, near the Adyar–Buckingham Canal intersection, on November 18, 2026. The ₹4-crore facility is intended to treat wastewater entering local waterways. It uses a hybrid anaerobic reactor and ultrafiltration, and the treated water is intended for groundwater recharge and irrigation of saplings in nearby areas.
The project was implemented through a partnership involving Chennai Metrowater, the Water Resources Department and other organisations, with support from Amazon’s corporate social responsibility fund. It includes 10 years of operation and maintenance.
Other completed civic works inaugurated included the restoration of Kadapakkam Lake, a waste transfer station at Pulianthope and a sponge park at Mathur. A 5.3-km green corridor from Chennai Airport to Kathipara Junction also received a foundation stone.
Notable Points
- Ultrafiltration pretreatment: Wastewater pretreatment before ultrafiltration may include screening household waste and other particles. pH balancing and coagulation are also common. The order of pretreatment steps can affect later stages.
- Anaerobic wastewater treatment: Anaerobic wastewater treatment can produce biogas, but removes pathogens, nitrogen and phosphorus poorly and may need post-treatment. In an upflow anaerobic sludge blanket reactor, solids requiring extensive digestion can stay for up to 90 days, while dissolved sugars may convert to gas and leave in less than a day.