Rayagada Railway Division Becomes Operational

Rayagada Railway Division Becomes Operational

The Rayagada Railway Division of East Coast Railway became operational on 1 June 2026, with its headquarters in Rayagada, Odisha. A Ministry of Railways gazette notification dated 4 May 2026 formalised its constitution with effect from 1 June.

Network and jurisdiction

The division has approximately 696 route kilometres. Its jurisdiction covers the Koraput–Singapur Road, Kottavalasa–Kirandul, Kuneru–Therubali and Gunupur–Paralakhemundi routes.

Administrative reorganisation

The division was created following the bifurcation of the erstwhile Waltair Division, with the Rayagada portion remaining under East Coast Railway. Its operationalisation is intended to strengthen railway administration and support economic development in southern Odisha.

Important Facts for Exams

  • Waltair bifurcation: The Rayagada Division was formed from Waltair’s Odisha section; its Andhra Pradesh section was assigned to the South Coast Railway zone.
  • Koraput line: The Rayagada–Koraput route is a single electrified broad-gauge line, with electric doubling under way.
  • KK line purpose: The Kottavalasa–Kirandul line, commonly called the KK line, was developed to carry Bailadila iron ore towards Visakhapatnam port.
Category: Odisha
Originally written on June 1, 2026 and last modified on November 20, 2026.
Tags: , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *