Railway Board Approves Chennai MRTS Transfer Proposal
The Railway Board approved the proposal to transfer Chennai’s Mass Rapid Transit System (MRTS) to Chennai Metro Rail Limited (CMRL) in a circular dated 12 August 2026, addressed to the General Manager of Southern Railway. The approval follows a draft Memorandum of Understanding signed by Southern Railway and the Tamil Nadu Government in May 2026.
Proposed transfer and transition
Under the draft arrangement, Southern Railway is to transfer MRTS assets and general operation and maintenance responsibilities within 90 days, excluding core train operations and maintenance. Full train operations and remaining maintenance responsibilities are to shift progressively to CMRL over a two-year transition. The handover covers land, stations and other infrastructure at 19 of the 21 MRTS stations, as well as tracks, signalling and telecom systems, lifts, escalators, foot overbridges and electric multiple-unit rolling stock. The Chennai Unified Metropolitan Transport Authority is coordinating the transfer.
Planned station connectivity
Platforms 9 and 10 at Chennai Beach are proposed for MRTS services. The Tamil Nadu Government plans a crossing arrangement at Chennai Fort to enable track connectivity. Southern Railway will review any state proposal to double the single track between Chennai Fort and Chennai Beach, subject to operational needs and land management policy.
Important Facts for Exams
- Elevated alignment: The MRTS’s elevated design was selected because its proposed route crossed congested city areas, helping avoid land-acquisition problems.
- Gauge compatibility: The MRTS uses the suburban railway’s broad gauge, allowing the same train sets to operate on both systems.
- Traction power: MRTS trains draw traction power from a 25 kV overhead catenary system.