ISRO Tests Semi-Cryogenic Engine Power Head at Full Thrust
The Indian Space Research Organisation (ISRO) conducted a 35-second hot test of a semi-cryogenic engine power-head test article (PHTA) at the Propulsion Research Complex (IPRC), Mahendragiri, in Tamil Nadu’s Tirunelveli district on 5 September 2026.
Test results and launch vehicle application
For the first time, the PHTA operated at its full 200-tonne thrust level, equivalent to 100% thrust, for five seconds during the test. ISRO said all recorded engine parameters proceeded as expected. The test also verified the switch-over of propellant supply from a low-pressure start tank to a medium-pressure run tank, supporting plans for longer-duration tests. It was the ninth hot test in the series; earlier tests reached 47% (94 tonnes), 60% (120 tonnes) and 88% (175 tonnes) thrust. The semi-cryogenic propulsion system is being developed to upgrade LVM3 with the SC120 semi-cryogenic propulsion stage, powered by the 2000 kN-class SE2000 engine.
Important Facts for Exams
- Power-head testing: A power-head test article brings key turbomachinery and associated feed and control hardware together, enabling integrated subsystem testing before a complete engine test.
- LVM3 propulsion stages: LVM3’s existing propulsion stack combines two S200 solid strap-on boosters, an L110 liquid core stage and a C25 cryogenic upper stage.