Chennai’s Poonamallee–Vadapalani Metro Corridor Opens
Chennai’s Poonamallee–Vadapalani Metro corridor began passenger service at 4 pm on 11 October 2026, extending the city’s public transport network by approximately 14.6–15 km.
Corridor 4 operations
The corridor is part of Chennai Metro Phase II and Corridor 4, also known as the Yellow Line. Initially, 11 of its 17 stations opened, linking Poonamallee with Porur and Vadapalani. At Vadapalani, the corridor connects with existing Metro lines. Prime Minister Narendra Modi and Tamil Nadu Chief Minister C. Joseph Vijay inaugurated the stretch.
Important Facts for Exams
- Phase II station design: Phase II stations were designed smaller than Phase I stations to reduce construction costs and save time.
- Yellow Line elevation: The Yellow Line’s underground section includes Lighthouse, Alwarpet, Nandanam and Panagal Park; its western section is elevated.
- CMRL ownership: Chennai Metro Rail Limited is a 50:50 joint venture of the Government of India and the Government of Tamil Nadu.
- Phase II signalling: Phase II’s communications-based train control (CBTC) signalling is designed to support unattended train operation.
Category: Tamil Nadu
Originally written on
October 11, 2026
and last modified on
November 20, 2026.
Tags: Chennai Metro, Chennai Metro Phase II, Corridor 4, Tamil Nadu, Yellow Line