Bhubaneswar Airport Opens Parallel Taxi Track
Biju Patnaik International Airport in Bhubaneswar began operating a 1,566-metre parallel taxi track and rapid-exit taxiway on 16 April 2026.
Facility and projected capacity
Built at a reported cost of ₹48 crore, the infrastructure is designed to let arriving aircraft leave the runway sooner and reduce runway occupancy time. With the upgrades, the airport’s projected capacity is estimated at 15–20 flights an hour. Nikhil Kumar Kanodia, Chief Vigilance Officer of the Airports Authority of India (AAI), inaugurated the facility.
Important Facts for Exams
- Exit angle: A rapid-exit taxiway meets the runway at 30 degrees rather than 90 degrees, enabling aircraft to leave the runway at higher speeds.
- Parallel taxiway layout: A parallel taxiway runs alongside a runway and connects to it at access points, allowing aircraft to reach the runway threshold without backtracking along the runway.
- Runway occupancy measurement: For a landing aircraft, runway occupancy time covers its use of the runway until it vacates; subsequent taxiing towards the apron is excluded.
- AAI formation: AAI was formed in 1995 by merging the National Airports Authority with the International Airports Authority of India, consolidating airport administration.
Originally written on
April 17, 2026
and last modified on
November 19, 2026.
Tags: Airports Authority of India, Biju Patnaik International Airport, Odisha, parallel taxi track, rapid-exit taxiway, runway occupancy time