Ashok Leyland Opens EV Plant in Lucknow

Ashok Leyland Opens EV Plant in Lucknow

Ashok Leyland inaugurated an electric vehicle manufacturing plant in Sarojini Nagar, Lucknow, on January 9, 2026. The plant was inaugurated by Uttar Pradesh Chief Minister Yogi Adityanath, Defence Minister Rajnath Singh and Union Minister for Heavy Industries H.D. Kumaraswamy.

Plant capacity and vehicle range

Located in the Sarojini Nagar Industrial area near Lucknow Airport, the facility covers about 70 acres. It is designed to manufacture electric buses, e-travellers and electric loading vehicles. Its initial annual capacity is 2,500 vehicles, with plans to expand production to 5,000 units in phases.

Important Facts for Exams

  • Circuit electric bus: Ashok Leyland launched Circuit, described as India’s first indigenously produced fully electric bus, in 2016; its stated single-charge range was 120 km.
  • HYBUS energy system: Ashok Leyland’s HYBUS used a diesel engine to charge ultracapacitors that powered its electric motor; the engine did not drive the bus forward.
  • Battery engineering research: In 2017, Ashok Leyland partnered with IIT Madras on battery-engineering research and development, particularly for electric vehicles.
Originally written on January 9, 2026 and last modified on November 19, 2026.
Tags: , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *