Veligonda Project’s First Phase Inaugurated

Veligonda Project’s First Phase Inaugurated

Andhra Pradesh Chief Minister N. Chandrababu Naidu inaugurated the first phase of the Poola Subbaiah Veligonda project on August 31, 2026, releasing Krishna water towards Nallamala Sagar.

Trial Run and Project Works

A trial run for releasing water through the project’s twin tunnels and feeder canal was successfully conducted on August 30. The completed works in the first phase include 18.8 kilometres of twin tunnels and 21.8 kilometres of feeder canals.

Irrigation and Drinking Water Capacity

The first phase is designed to provide irrigation to 1.19 lakh acres and drinking water to approximately four lakh people. It incurred an expenditure of ₹7,983 crore, against an estimated total project cost of ₹10,200 crore.

Important Facts for Exams

  • Tunnel diameters: The twin parallel tunnels have unequal internal diameters: 7 metres for Tunnel 1 and 9.2 metres for Tunnel 2.
  • Wildlife-sensitive tunnelling: The tunnels pass beneath the Nallamala hills’ tiger reserve, and a double-shielded boring machine is used to limit wildlife disturbance.
  • Krishna River administration: The Krishna River Management Board was established under Section 85 of the Andhra Pradesh Reorganisation Act 2014, with functions over scheduled projects and water releases.
Category: Andhra Pradesh
Originally written on August 31, 2026 and last modified on November 20, 2026.
Tags: , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *