Vande Bharat Sleeper Connects Howrah and Kamakhya
Prime Minister Narendra Modi flagged off India’s first Vande Bharat Sleeper train from Malda Town, West Bengal, on 17 January 2026. The service connects Howrah Junction in West Bengal with Kamakhya Junction in Guwahati, Assam. Chief Minister Himanta Biswa Sarma and Governor Lakshman Prasad Acharya attended the inauguration at Kamakhya Junction.
Route and service features
The overnight, fully air-conditioned train covers about 968–972 kilometres in approximately 14 hours. Its 16-coach formation comprises 11 AC three-tier coaches, four AC two-tier coaches and one first-class AC coach, with capacity for about 823 passengers. The train has a maximum design speed of 180 km/h but is expected to operate at up to 130 km/h for safety. Its features include the KAVACH anti-collision system, automatic doors and improved suspension.
Scheduled commercial departures
The first commercial journey from Kamakhya, Train No. 27576, was scheduled for 22 January 2026; the first departure from Howrah, Train No. 27575, was scheduled for 23 January. Guwahati-based Mayfair Spring Valley Resort secured the catering contract and will offer traditional Bengali and Assamese cuisine.
Important Facts for Exams
- Sleeper formation: Vande Bharat sleeper sets comprise sixteen air-conditioned sleeper coaches.
- Prototype development: Integral Coach Factory helped develop the sleeper version, whose first prototype was rolled out by BEML in September 2024.
- Distributed deployment: KAVACH uses distributed trackside infrastructure, allowing phased deployment; ETCS, by contrast, requires centralised trackside infrastructure.