Union Cabinet Approves Jaipur Metro Phase 2
The Union Cabinet, chaired by Prime Minister Narendra Modi, approved Jaipur Metro Phase 2 on 8 April 2026. The project in Rajasthan is estimated to cost ₹13,037.66 crore.
Route and Connectivity
The planned 41-kilometre north–south corridor will run from Prahladpura to Todi Mod and include 36 stations. It is designed to connect the Sitapura industrial area, Jaipur Airport, Tonk Road, SMS Hospital and Stadium, Ambabari, and Vidhyadhar Nagar. An interchange and feeder system will link the corridor with the existing metro.
Implementation and Timeline
Rajasthan Metro Rail Corporation Limited will implement the project. The corporation is a 50:50 joint venture of the Union and Rajasthan governments. Completion is targeted for September 2031.
Important Facts for Exams
- Triple-storey alignment: Jaipur Metro was India's first metro to run on a triple-storey structure combining an elevated road and metro track.
- Orange Line station mix: The planned Orange Line comprises 34 elevated stations and two underground stations.
- Interchange design: At Khasa Kothi, a foot overbridge will connect separate elevated stations on the Orange and Pink lines for transfers.
Category: Rajasthan
Originally written on
April 8, 2026
and last modified on
November 19, 2026.
Tags: Jaipur Metro Phase 2, Rajasthan, Rajasthan Metro Rail Corporation Limited, Sitapura industrial area, Union Cabinet