Modi Inaugurates Bhogapuram Airport Terminal, Lays Semiconductor Unit Foundation
Prime Minister Narendra Modi inaugurated the terminal building of Alluri Sitarama Raju International Airport at Bhogapuram, Andhra Pradesh, on August 1, 2026. The airport project has an estimated cost of over ₹5,640 crore and was developed under the public-private partnership (PPP) model.
Semiconductor Unit at Tarluwada
During the same programme, Modi virtually laid the foundation stone for the ASIP Technologies Semiconductor Packaging – Testing Unit at Tarluwada, Visakhapatnam. The project is an Outsourced Semiconductor Assembly and Test (OSAT) facility, with an initial investment of over ₹460 crore and a total investment of ₹2,500 crore.
Important Facts for Exams
- Passenger terminal capacity: Alluri Sitarama Raju International Airport’s passenger terminal covers 77,342 square metres and is designed to handle six million passengers annually.
- Runway and landing aids: Alluri Sitarama Raju International Airport has a 3,800-metre asphalt runway equipped with a CAT I Instrument Landing System and VOR/DME.
- Packaging stage: Integrated circuit packaging is the final stage of device fabrication: its case protects the die and provides contacts, and testing follows packaging.
Category: Andhra Pradesh
Originally written on
August 1, 2026
and last modified on
November 20, 2026.
Tags: Alluri Sitarama Raju International Airport, Andhra Pradesh, ASIP Technologies Semiconductor Packaging - Testing Unit, Narendra Modi, Outsourced Semiconductor Assembly and Test (OSAT) facility, public-private partnership (PPP) model