Lucknow Opens Two Green Corridor Sections

Lucknow Opens Two Green Corridor Sections

On 13 March 2026, Defence Minister Rajnath Singh and Uttar Pradesh Chief Minister Yogi Adityanath inaugurated two completed sections of Lucknow’s Green Corridor.

Opened and Planned Sections

The opened sections connect IIM Road to Pakka Pul and Pakka Pul at Daliganj to Samta Mulak Chauraha. Foundation stones were laid for the later sections from Samta Mulak Chauraha to Shaheed Path and from Shaheed Path to Kisan Path. The full scheme is about 28 kilometres long; these later phases were not complete at the event.

Category: Uttar Pradesh
Originally written on March 13, 2026 and last modified on November 19, 2026.
Tags: , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *