Kalyani Expressway and Road Works Inaugurated

Kalyani Expressway and Road Works Inaugurated

West Bengal Chief Minister Mamata Banerjee inaugurated the Kalyani Expressway and associated road works in West Bengal on 2 March 2026.

Route and associated works

The approximately 44–45-km expressway connects the Belgharia Expressway junction with the Kapa–Bara Jaguli area and links to National Highway 12 at Bara Jaguli. The inaugurated works include a three-lane, 1.5-km flyover linking the Belgharia Expressway at Nimta to the Kalyani Expressway, and a six-lane, 6.5-km elevated corridor between Kapa and Bara Jaguli. The project cost approximately ₹2,500 crore. It is intended to improve road links between Kolkata, Kalyani and surrounding areas and reduce travel time.

Important Facts for Exams

  • Carriageway layout: The Kalyani Expressway generally has six main-carriageway lanes, reduced to four in some low-traffic stretches, plus two service lanes on each side.
  • Development agency: The West Bengal Highway Development Corporation developed the Kalyani Expressway.
  • State-highway interchanges: The Kalyani Expressway has interchanges with both State Highway 1 and State Highway 2 at different points.
Originally written on March 2, 2026 and last modified on November 19, 2026.
Tags: , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *