Jaisalmer Station Developed as Rail Maintenance Hub

Jaisalmer Station Developed as Rail Maintenance Hub

North Western Railway’s Jodhpur division completed the development of Jaisalmer railway station as a rail maintenance hub. The project, completed by the division’s Gati Shakti unit at a cost of ₹128.25 crore, was reported on 29 March 2026.

Maintenance facilities and track works

The project included a coaching maintenance facility, an electric locomotive trip shed and a wheel lathe line. It also added 4.8 km of track and 16 turnouts. The works included 650 AT welding works, a 2,400-square-metre main shed and a 1,600-square-metre auxiliary building.

Signalling and operational capacity

Yard signalling improvements increased the number of routes from 56 to 108. The expanded route capacity is intended to support more flexible, controlled and faster train operations, alongside improved train maintenance capacity.

Important Facts for Exams

  • Block protection: Railway block signalling divides lines into sections so trains cannot occupy the same section simultaneously, a basic safeguard for train movements.
  • Track-circuit detection: A track circuit detects a train when it short-circuits current in the rails, de-energising a relay to register that the section is occupied.
  • Wheel-profile restoration: A railway wheel lathe restores tread and flange profiles, removing wear or wheel flats that can increase vibration and damage rails.
  • Trip-shed servicing: A locomotive trip shed typically handles examinations and light servicing between journeys; it is distinct from a depot equipped for heavy periodic maintenance.
Category: Rajasthan
Originally written on March 29, 2026 and last modified on November 19, 2026.
Tags: , , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *