Himachal Pradesh Approves Road Drainage Policy
The Himachal Pradesh Cabinet approved a new Road Drainage Policy on February 12, 2026, to mitigate monsoon damage to roads. The state government officially notified the policy on February 19.
Drainage Design and Slope Protection
The policy requires drainage structures for new road projects to be designed using scientific hydrological data, including actual rainfall intensity and catchment characteristics, instead of standardised templates. Box culverts are the default drainage structure because they are less prone to clogging and can be cleaned mechanically. The policy also requires preventive measures in landslide-prone and seepage areas to strengthen hillside protection and reduce slope instability. It treats drainage as a core engineering component of road infrastructure.
Phased Implementation
Implementation will proceed in phases, initially focusing on Major District Roads to support all-weather connectivity in economically and strategically vital regions. The Public Works Department of Himachal Pradesh maintains a road network exceeding 40,000 kilometres. The state reportedly incurred estimated losses of about ₹2,400 crore in 2023 and ₹3,000 crore in 2025, attributed to road damage linked to inadequate drainage and slope instability during monsoons.
Important Facts for Exams
- Culvert siting: Culvert design balances hydraulic performance with limits on upstream water level and roadway embankment height, making type and shape site-dependent.
- Undersizing risk: An undersized culvert can erode surrounding soil; progressive scour may culminate in sudden failure during even medium-sized rain events.