Dohri Ghat Pump Canal Modernised in Mau

Dohri Ghat Pump Canal Modernised in Mau

Uttar Pradesh Water Power Minister Swatantra Dev Singh inaugurated the modernised Chaudhary Charan Singh Dohri Ghat Pump Canal in Mau on 25 September 2026. The canal was built in 1956 during the Second Five-Year Plan.

Modernisation and capacity

The upgrade of the approximately 70-year-old canal included new motors, pumps and panels, an upgraded substation and a modern control room. The irrigation department stated that the canal can now operate at its full capacity of 660 cusecs. Before the upgrade, old machinery limited it to around 400–450 cusecs, or about 60% of capacity.

Irrigation coverage

The modernised canal is expected to provide irrigation to approximately 55,000 hectares of agricultural land in Mau and Ballia districts. The project also included 30-kilowatt solar panels and a terrace seating area at the canal premises.

Important Facts for Exams

  • Pump-flow distinction: Centrifugal pumps turn fluid flow through 90 degrees over an impeller, whereas axial-flow pumps keep its direction unchanged.
  • Photovoltaic conversion: Solar-panel photovoltaic cells release electrons under light; their movement through a circuit generates direct-current electricity.
Category: Uttar Pradesh
Originally written on September 25, 2026 and last modified on November 20, 2026.
Tags: , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *