Centre Approves ₹294.10 Crore for Thalot Landslide Mitigation

Centre Approves ₹294.10 Crore for Thalot Landslide Mitigation

On 28 February 2026, the Centre approved ₹294.10 crore for long-term landslide mitigation and slope stabilisation on the Thalot section of Kiratpur–Manali National Highway-3 in Himachal Pradesh. Union Minister for Road Transport and Highways Nitin Gadkari announced the approval through his official social media accounts.

Works on the Pandoh–Kullu stretch

The project covers identified landslide-prone locations on the Pandoh–Kullu stretch in Mandi district. It will use advanced slope protection systems and reinforced concrete structures as permanent corrective measures. The stated aims are to improve slope stability, make travel safer and strengthen the highway corridor, which connects destinations including Kullu, Manali, Lahaul-Spiti and Leh.

Important Facts for Exams

  • Route formation: NH-3 was assembled from sections of the former NH 1, NH 70 and NH 21 during national-highway renumbering in 2010.
  • Concrete reinforcement: Reinforced concrete combines concrete, which resists compression, with reinforcement that carries tensile forces, helping the composite resist bending.
  • Slope-failure mechanics: Slope failure can result from reduced material shear strength, increased shear stress, or both acting together.
  • Movement types: Landslide classification distinguishes falls, topples, slides, spreads, flows and slope deformations by how material moves or changes shape.
Category: Himachal Pradesh
Originally written on February 28, 2026 and last modified on November 19, 2026.
Tags: , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *