Amritsar Inaugurates Sultanwind Link Road Railway Overbridge

Amritsar Inaugurates Sultanwind Link Road Railway Overbridge

Punjab Chief Minister Bhagwant Singh Mann inaugurated the completed Sultanwind Link Road railway overbridge in Amritsar on 28 June 2026. The project, including its approach roads, is 985 metres long.

Project cost and dimensions

The flyover itself is 725 metres long and 14 metres wide. It was completed for ₹22.68 crore, against an estimated cost of ₹34.20 crore, saving ₹11.52 crore.

Traffic and water management

The overbridge is intended to ease congestion around Sultanwind junction and improve access for the lakhs of pilgrims and tourists visiting Amritsar daily. The project includes an RCC drain for rainwater and rainwater-harvesting provisions for groundwater recharge.

Important Facts for Exams

  • ROB–RUB distinction: A road overbridge crosses railway tracks at a different level; a road underbridge passes beneath them, avoiding conflicts between road and rail traffic.
Category: Punjab
Originally written on June 28, 2026 and last modified on November 20, 2026.
Tags: , , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *