Amaravati’s E-3 Seed Access Road Phase II Inaugurated

Amaravati’s E-3 Seed Access Road Phase II Inaugurated

Andhra Pradesh Chief Minister N. Chandrababu Naidu inaugurated Phase II of Amaravati’s E-3 Seed Access Road on August 13, 2026.

Route and project design

The 21.77-kilometre corridor is being developed in three phases at an estimated cost of ₹1,519 crore. It links Dondapadu, Rayapudi, Venkatapalem, Penumaka, Undavalli and Tadepalli, and is planned to connect with National Highway 16 near Manipal Hospitals. The planned 60-metre-wide road includes a nine-lane carriageway, a dedicated BRTS corridor and service roads.

Important Facts for Exams

  • Network role: The E-3 Seed Access Road forms part of Amaravati’s Seed Access Road Network, intended to connect Vijayawada with Amaravati.
  • Third-phase bridge: The planned third phase includes a 320-metre cable bridge and a 3.5-kilometre stretch connecting the road to NH 16 at Kanakadurga Varadhi.
  • Golden Quadrilateral link: National Highway 16 forms the eastern coastal arm of India’s Golden Quadrilateral, linking Kolkata and Chennai through Odisha and Andhra Pradesh.
Category: Andhra Pradesh
Originally written on August 13, 2026 and last modified on November 20, 2026.
Tags: , , , ,

Leave a Reply

Your email address will not be published. Required fields are marked *