Ajan Dam Water Reaches Keoladeo Wetlands
By 14 August 2026, about 30 million cubic feet (MCFT) of water from Ajan Dam had reached the wetlands of Keoladeo National Park in Bharatpur, Rajasthan. The inflow raised water levels in several blocks during the birds’ breeding period.
Water distribution in the park
Rainfall in Ajan Dam’s catchment area began on 8 August. The district administration and Water Resources Department facilitated the release through Dakan Mori. Divisional Forest Officer Chetan Kumar said water was directed to the D-block, which reached about 80% of its four-foot capacity. Further distribution within the wetland was underway, with the B-block next in line.
Important Facts for Exams
- Regulated wetland: Keoladeo includes a human-made regulated wetland that provides animals with water in this drier region.
- Seasonal water cycle: Water persists in some depressions; alternating wet and dry conditions help maintain the freshwater swamp for waterbirds.
- Drought buffering: Deep tube wells can fill small depressions, helping conserve seeds, spores and other aquatic life during extreme drought.
Category: Rajasthan
Originally written on
August 14, 2026
and last modified on
November 20, 2026.
Tags: Ajan Dam, D-block, Dakan Mori, Keoladeo National Park, Rajasthan, Water Resources Department