Engineering Current Affairs, GK & News

Engineering  Current Affairs, GK & News

Domain wise Highlights from India Skills Report 2019

The India Skills Report 2019 was prepared by conducting a survey from more than 3,10,000 students across 29 states, 7 Union territories and from above 100 employers. This year marks the sixth edition of the most referred and only report in India about the talent landscape of the country. The report is an initiative of ..

Category: 

Topics: 

EEPC celebrates 50 years of rewarding exporters

The Engineering Export Promotion Awards (EEPC) celebrated its 50th year of Engineering Export Awards in New Delhi on Tuesday, 10th December 2019. A total of 111 National Awards for 2017-18 across 8 different categories in over 32 product panels were awarded to mark the occasion of completion of 50 years. This year the Quality Control ..

Category: 

Topics: 

India Skills Report: Maharashtra with highest employable talent

On December 9, 2019, the India Skills Report was released jointly by the CII (Confederation of Indian Industry), AICTE (All India Council for Technical Education), UNDP (United Nations Development Programme) and AIU (Association of Indian University). The report provides employability of citizens in the country across the states and. The report also ranked the cities ..

Month: 

Category: 

Topics: 

India’s longest electrified rail tunnel inaugurated in Andhra Pradesh

In Andhra Pradesh, Vice-President M Venkaiah Naidu has recently dedicated the India’s longest electrified rail tunnel i.e situated between Cherlopalli and Rapuru. He also inaugurated the 112-km long electrified railway line between Venkatachalam and Obulavaripalli. The length of the electrified rail tunnel is 6.6km. The tunnel has 44 trolley refuges and 14 cross-passages in a ..

Month: 

Topics: 

Indian army signs pact with NHPC for construction of tunnels on China & Pakistan borders

Indian Army signed a Memorandum of Understanding (MOU) with National Hydroelectric Power Corporation (NHPC) to construct four underground tunnels for storage of ammunition along the China and Pakistan border. This is a pilot project and the tunnels are expected to be completed within two years. The cost of the pilot project is around Rs 15 ..

Topics: 

1 / 3123