Lucknow–Kanpur Expressway inaugurated on July 13
The 63-kilometre, six-lane Lucknow–Kanpur Expressway was inaugurated on July 13, 2026, by Defence Minister Rajnath Singh, Union Road Transport and Highways Minister Nitin Gadkari and Uttar Pradesh Chief Minister Yogi Adityanath.
Route and operations
Toll collection was scheduled to start on July 14. Two-wheelers and three-wheelers are not permitted on the expressway. The route is expected to reduce travel time between Lucknow and Kanpur to approximately 35–45 minutes.
Project details
The National Highways Authority of India developed the expressway at an estimated cost of around ₹4,200 crore to ₹4,700 crore.
Important Facts for Exams
- National expressway number: The Lucknow–Kanpur Expressway was designated National Expressway 6 (NE 6) in the Government of India’s December 2020 Gazette notification.
- Future lane capacity: The expressway’s six-lane carriageway is designed to be expandable to eight lanes.
- Contract model: NHAI selected the contractor for both project packages under the Hybrid Annuity Model (HAM), covering construction and operation.
- Elevated sections: Two elevated sections lie between Amausi and Bani, one 3.375 kilometres and the other 9.14 kilometres long.
Category: Uttar Pradesh
Originally written on
July 13, 2026
and last modified on
November 20, 2026.
Tags: Lucknow–Kanpur Expressway, National Highways Authority of India, Nitin Gadkari, Rajnath Singh, Uttar Pradesh, Yogi Adityanath