Automatic signalling commissioned on Mohasa–Karaunda–Agasod–Bina rail section
Automatic signalling was commissioned on 15 October 2026 on the Mohasa–Karaunda–Agasod–Bina rail section in the Jhansi Division of North Central Railway.
Signalling and safety upgrades
The installation includes 144 MSDAC track-detection systems to monitor train presence. It adds 27 new four-aspect signals and upgrades 12 existing signals at Mohasa and Karaunda stations. The work also brought level crossing No. 313 into full interlocking in the Agasod–Karaunda section and upgraded electronic interlocking systems at both stations. Railway officials expect the changes to expand line capacity, improve punctuality and enhance safety by reducing human error.
Important Facts for Exams
- MSDAC occupancy detection: A multi-section digital axle counter compares wheel-axle counts at section boundaries; matching entry and exit totals allow the system to register a section as clear.
- Four-aspect warning sequence: Four-aspect signalling adds a preliminary-caution stage, giving drivers warning before a restrictive signal and potentially permitting shorter train headways than fewer-aspect arrangements.
- Electronic route protection: Electronic interlocking checks that points are correctly positioned and locked, and prevents conflicting routes from being set before permitting a signal to clear.
- Interlocked level crossings: At an interlocked level crossing, railway signals are normally prevented from clearing until road barriers are closed and locked, linking crossing protection to train movements.
Category: Uttar Pradesh
Originally written on
October 16, 2026
and last modified on
November 20, 2026.
Tags: automatic signalling, electronic interlocking systems, four-aspect signals, Jhansi Division, MSDAC track-detection systems, North Central Railway, Uttar Pradesh