Andhra Pradesh High Court seeks PCB affidavit on inspections at Parawada Pharma City
On May 6, 2026, the Andhra Pradesh High Court heard public interest litigation (WP(PIL) No. 104 of 2026), filed by Paila Sanyasi Raju over alleged environmental violations at Parawada Pharma City. The court directed a competent Pollution Control Board officer to file an affidavit.
Information sought by the court
The affidavit must identify the pharmaceutical companies operating in the area and state whether they comply with applicable rules, when the area was last inspected, and whether inspections take place at regular intervals. The court listed the matter for June 24, 2026.
Allegations in the petition
The petition alleged that Ramky Pharma removed green-belt cover and excavated a pond to dump waste. The allegations had not been adjudicated in the order. It records the respondents’ submission that excavation had stopped and that the direction to stop it had been complied with.
Important Facts for Exams
- Board coordination: India’s Central Pollution Control Board coordinates State Pollution Control Boards through technical assistance and guidance, and also resolves disputes between them.
- Water discharge consent: Under the Water (Prevention and Control of Pollution) Act, 1974, State Boards require prior consent for new outlets discharging sewage or trade effluent.
- Hazardous-waste authorisation: A pharmaceutical unit generating hazardous waste needs authorisation from its State Pollution Control Board under the Hazardous and Other Wastes Rules, 2016, separate from consent to operate.