Maharashtra Plans Solarisation of Rural Drinking-Water Schemes

Maharashtra Plans Solarisation of Rural Drinking-Water Schemes

Maharashtra proposed phased solarisation of rural drinking-water schemes to reduce pressure from electricity bills and arrears. The policy direction, reported on 13 June 2026, calls for Maharashtra Energy Development Agency to prepare a comprehensive framework.

Assessment of each scheme

The framework is to consider the water source, population served, pump capacity and electricity demand. Solarisation of 22,185 water-supply schemes was proposed. Solar equipment was already included in the original plans of 11,643 schemes under Jal Jeevan Mission; these figures should not be added together as separate completed installations.

Maintenance arrangements

The proposal includes a taluka-level maintenance system involving gram panchayats. Lists of authorised repair agencies would be prepared, with the gram sabha selecting an agency through a resolution. Water-charge collections would support maintenance, with local-body assistance where collections are insufficient.

Service objective

The policy emphasises the benchmark of 55 litres of water per person per day and strengthening existing water sources. The proposal concerns future phased implementation, rather than evidence that every rural scheme had already switched to solar power.

Category: Maharashtra
Originally written on June 13, 2026 and last modified on November 26, 2026.
Tags:

Leave a Reply

Your email address will not be published. Required fields are marked *