The Union Minister directed sediment removal at the Salal Power Project in Jammu and Kashmir to maximise water use amid the Indus Waters Treaty between India and Pakistan being kept in abeyance. Salal is a 690 Megawatt (MW) run-of-the-river hydroelectric project on the Chenab River in Reasi district. It is owned by National Hydroelectric Power Corporation (NHPC). It was India’s first hydropower project under the Indus Waters Treaty regime in Kashmir. The dam is 130 metres high at 1627 feet above mean sea level. Jammu and Kashmir gets 12.5 percent power, while the rest goes to the Northern Grid supplying multiple northern states.
This Question is Also Available in:
हिन्दीमराठीಕನ್ನಡతెలుగుગુજરાતી