A 500 MW floating solar plant is being planned at Kariba Dam by Green Hybrid Power in partnership with Intensive Energy User Group. The dam is located on the Zambezi River at the Kariba Gorge, forming the boundary between Zambia and Zimbabwe. It is a double-curvature concrete arch dam, completed in 1959, and stands about 128 metres high. The dam plays a crucial role in power generation, supplying electricity to both Zambia and Zimbabwe. Its construction led to the creation of Lake Kariba, the world’s largest human-made lake by volume.
This Question is Also Available in:
हिन्दीગુજરાતીमराठीతెలుగుಕನ್ನಡ